ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
Recent Posts
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
Interesting week
by HotLine1. 05/20/17 11:57 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,775 Are you busy
171,793 Re: Forum
164,722 Need opinion
Who's Online Now
0 registered members (), 58 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#168681 - 09/12/07 10:11 PM How would you do it  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,080
Estero,Fl,usa
My wife has a project in some golf course bathrooms. The electrician she hired is having a problem with a plan that makes her happy. They are putting in a switch by the door on a concrete block wall. This is "tie beam" construction so the top 2 blocks are solid concrete. How do you get down the wall? She thinks EMT is too industrial, Wiremold is tacky.

My thought is to come down from the ceiling with pipe and LB into the core below the tiebeam so they can go with hidden wire and a flush box at eye level.

She says what else can you do.


Greg Fretwell

Work Gear for Electricians and the Trades

#168682 - 09/12/07 10:51 PM Re: How would you do it [Re: gfretwell]  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
Greg,
Your plan sounds good, but how are they going to wire the light in without some surface wiring method or another?
Also, doesn't this have to meet ADA height?


#168684 - 09/12/07 11:01 PM Re: How would you do it [Re: electure]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,826
Brick, NJ USA
How about a ceiling mounted motion detector? No pipe, drilling & nothing ugly! Also, it's ADA compliant!

Your idea sounds like a 'plan' also.


John

#168685 - 09/12/07 11:06 PM Re: How would you do it [Re: gfretwell]  
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
Time to take a roto-hammer to the wall, dig a trench, run your pipe or MC, and patch. At least, that's how they do it in the "Old" country laugh

If the trench is deep enough, you won't even need to bury a protective plate over it either.


#168687 - 09/12/07 11:25 PM Re: How would you do it [Re: gfretwell]  
trollog  Offline
Member
Joined: Oct 2004
Posts: 276
San Diego California USA
Furring the wall out a few inches is another option. You lose 2-3 inches of room along one wall but you get protected dead space in the wall to run wires, conceal boxes, etc.


#168693 - 09/13/07 01:48 AM Re: How would you do it [Re: trollog]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,080
Estero,Fl,usa
The ceiling is drywall under trusses so that is a free fire zone, the only question is the switch by the door for the light.

Reno, the inspector is not going to be happy if you notch the tiebeam. That is structural.

I also suggested the motion sensor but they want a switch too. This is not California and these folks don't mind spending money to keep the fan going all day long.
I suggested putting a bell box on the back wall (the service is there anyway on the outside) and put the motion sensor there. That could be pretty tight to the ceiling and they could come through the soffit and fish over the block wall to that. Then come out of there to a ceiling fan box. Use that as the J box to pick up the exhaust fan, hold a ceiling light and over to the switch. If they decide to go with a paddle fan with a light kit later they will be good to go.


Greg Fretwell

#168718 - 09/13/07 11:39 AM Re: How would you do it [Re: gfretwell]  
A-Line  Offline
Member
Joined: Jul 2004
Posts: 272
Utah, USA

Last edited by A-Line; 09/13/07 11:44 AM.

#168720 - 09/13/07 12:01 PM Re: How would you do it [Re: A-Line]  
Alan Belson  Offline
Member
Joined: Mar 2005
Posts: 1,803
Mayenne N. France
A pull switch?


Wood work but can't!

#168721 - 09/13/07 12:09 PM Re: How would you do it [Re: A-Line]  
mikesh  Offline
Member
Joined: Jun 2006
Posts: 613
Victoria, BC, Canada
I hate retrofit in cinder block or even worse in concrete The most versatile is to cut the top blocks vertically until you get past the bond and down to the hollow part and install emt and steel flexible conduit to get down the blocks to the switch. Use a masonry box and a lot of mortar to fill the cut and set the box. Stuff a bug wad of metal screen in the block that the switch occupies to hold the cement or mortar from falling down the wall. You might want to ask the building inspector or a structural engineer what parts of the bond you should avoid but I am sure it is possible to cut it vertically for the depth of 2 or 3 inches you would need to get the emt through. I have done too many of these and that is what i did with Building inspection approval. The ceiling is surface if there is not void above. If you should decide on BX or any aluminum raceway you need to be sure there are no chloride additives in the cement or you will need to protect the armour with tar heavy tape etc.


#168752 - 09/13/07 11:36 PM Re: How would you do it [Re: mikesh]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,080
Estero,Fl,usa
Thanks, when I presented the options they are leaning toward just using the motion sensor (no wall switch) and using the override function if they want the fan on all the time.

We also found out this ceiling is stucco over wire, not drywall so poking holes is not as easy as we thought.


Greg Fretwell

Page 1 of 2 1 2

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.017s Queries: 17 (0.003s) Memory: 0.8209 MB (Peak: 1.0024 MB) Zlib enabled. Server Time: 2017-05-25 23:40:06 UTC