ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,339 Are you busy
174,809 Re: Forum
167,185 Need opinion
Who's Online Now
0 registered members (), 50 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#111660 - 01/17/07 06:54 PM House of Horrors ... Part 1 & 2  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
Part 1:
Quote
I was sent to a house to troubleshoot-(3) receptacles in one room. (1) receptacle in another, a tripping circuit, and 2 switches. Let the nightmare begin. After TWO days, let me share just some of the things I found, in no particular order. 1st picture is a standard fan box. 5 of these were under the porch. 4 had fans installed (non-damp location rated) I removed one to check for power and I found it hung from 2-1”tek screws put into the 8-32 ears EVEN THOUGH the box is clearly stamped to use the 10-24 studs for fan installation. 2nd picture is one of the 3 j-boxes I found under the soffit. 3rd picture is a j-box I found in the ceiling.

JohnJ0906
[Linked Image]

[Linked Image]

[Linked Image]


2017 / 2014 NEC & Related Books and Study Guides

#111661 - 01/17/07 06:56 PM Re: House of Horrors ... Part 1 & 2  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
Part 2:
Quote
More of the basement. Under the steps I found 2 wires rolled up, no tape, no wirenuts, no box, BOTH HOT! (The nailon w/blank is a temp j-box for them) Above this is a plethora of cut wires. At least these are not hot. Then we have a receptacle buried under the paneling. It was easy to find-someone marked it in pencil “outlet”. Next we have an empty nailon behind paneling. It wasn’t empty when I found it! It had (1) 14-2 and (1) 14-3 entering from what I think was a 3way at one time. (This is over one of 3 doors to the exterior, the 14-3 goes to a 4way, then 2 a 3way at the other doors) Exiting this box was (2) 14-2 and…. A single 14 ga. Wire! Going to the new switch location. Are we having fun yet?

JohnJ0906
[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]


#111662 - 01/17/07 10:35 PM Re: House of Horrors ... Part 1 & 2  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,217
SI,New Zealand
Did someone get a beaver to chew that hole out for the receptacle in the 2nd last pic?
Boy that's rough! [Linked Image]


Let's face it, these days if you're not young, you're old - Red Green grin

#111663 - 01/23/07 01:05 PM Re: House of Horrors ... Part 1 & 2  
cschow  Offline
Member
Joined: Sep 2006
Posts: 41
Boise, ID, USA
Did someone get a beaver to chew that hole out for the receptacle in the 2nd last pic?
Boy that's rough!

I would venture a guess and say a hammer claw did that.


#111664 - 01/23/07 06:24 PM Re: House of Horrors ... Part 1 & 2  
Rewired  Offline
Member
Joined: Jan 2006
Posts: 558
Hamilton, Ontario, Canada
Whats with all those nipped off romex cables in the 5'th pic down?? Any of em live? What a mess this is but i have seen similar in some of these rental properties we look after. Similar if not worse!

A.D



Member Spotlight
noderaser
noderaser
Portland, Oregon, United States
Posts: 404
Joined: March 2007
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.002s) Memory: 0.7713 MB (Peak: 0.9073 MB) Zlib enabled. Server Time: 2017-07-26 04:46:55 UTC