ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
What do you do?
by gfretwell. 09/24/17 12:05 PM
75 kva tranformer
by sparkync. 09/23/17 06:41 PM
Another generator question
by gfretwell. 09/23/17 04:15 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,922 Are you busy
176,722 Re: Forum
168,573 Need opinion
Who's Online Now
1 registered members (dougwells), 48 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#106834 - 01/19/05 10:16 PM Flexible Cord Issues  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,457
NY, USA
(submitted via Joe Tedesco)
Quote
I have a question pertaining to the use of flexible cords in a manufacturing environment. My area of expertise is safety and health for general industry and during inspections and audits at our facilities throughout the US, I find the use of flexible cords as an area of great concern.

During a recent visit to one of our manufacturing sites I spotted what I feel are clear cut violations of OSHA regulations and the NEC, however the electrical contractor that installed the wiring insists that his work meets code. This flexible wiring is primarily used to power outlet boxes and permanently installed equipment.

Michael J. Tanke
Strain Relief:

[Linked Image]

[Linked Image]

Outlet Box Wiring:

[Linked Image]

[Linked Image]

Wiring Method:

[Linked Image]


[This message has been edited by Webmaster (edited 01-19-2005).]


2017 / 2014 NEC & Related Books and Study Guides

#106835 - 01/19/05 10:19 PM Re: Flexible Cord Issues  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,457
NY, USA
Suspended Outlet Boxes:

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

Flexible wiring at ceiling:

[Linked Image]


#106836 - 01/19/05 10:21 PM Re: Flexible Cord Issues  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,457
NY, USA
Flexible cord to electrical panels:

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

Flexible cord use:

[Linked Image]


#106837 - 01/20/05 12:51 AM Re: Flexible Cord Issues  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,261
Fullerton, CA USA
Was a permit pulled for his work?


#106838 - 01/20/05 03:13 AM Re: Flexible Cord Issues  
Big Jim  Offline
Member
Joined: Jul 2003
Posts: 394
Denver, CO USA
Who's code? Not the NEC for sure.


#106839 - 01/20/05 07:09 PM Re: Flexible Cord Issues  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,222
SI,New Zealand
Hanging what looks like poly-phase cords from a roof, without adequate support sets up a bit of a dangerous precedent.
What annoys me more, when this standard of work is installed by an EC, some workers on site, get the idea that this is how things are done.
This guy's work just screams "I don't give a ****!".
Or "I'm not smart enough to use real wire and conduit". [Linked Image]

{Message edited for spelling errors}

[This message has been edited by Trumpy (edited 01-20-2005).]


Let's face it, these days if you're not young, you're old - Red Green grin

#106840 - 01/20/05 07:33 PM Re: Flexible Cord Issues  
bp-redbear  Offline
Member
Joined: Aug 2004
Posts: 51
NY
I used to work in a manufacturing plant, and now work in a food processing plant. Flexible cord is often used (wrongly) as a substitute for a fixed wiring method. If the equipment is frequently moved, that's one thing...

In these pics we see fittigs that are intended for armored or metal-clad cable used with flex cord. Unfortunately, I was taught to do this. I now use prpoer fittings for cords.

The 4sq. handy box hanging in mid-air is listed to be mounted permanently.

Some strain reliefs and cord grips, but, some of the wiring methods and uses of cords look real low-budget.


#106841 - 01/20/05 10:15 PM Re: Flexible Cord Issues  
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
S.O., S.O., Its off to work we go!


#106842 - 01/20/05 10:51 PM Re: Flexible Cord Issues  
John Steinke  Offline
Member
Joined: Apr 2001
Posts: 518
Reno,Nv., USA
I hate to say this, but the intall might actually be legit, if messy looking.
Drop cords....those plugs coming down from the ceiling...are a common way to power machinery. It works very well, and often places the cord in a place where it's out of the way (how often have you tripped over a pipe or raceway set on the floor?).
The two-screw connectors are actually listed for connecting flexible cords...look at the note on the box they come in.
The prohibition of flexible cord above a dropped ceiling dates from 2002...so that would be OK if older than that.
Many of the cords look as if they came with the machines- in which case using them is proper.

Several of the parts used are not cheap, and show some attention to detail.

One area of possible concern....flexible cords can not be uses as a substitute for permanent wiring (400.8(1)). The long run across a ceiling may be such an area of violation. (Drop cords typically drop straight down, not run horizontally).

I can't find it right now (someone help me here!), but I know that the NEC also requires pendant boxes to have the cord enter through a threaded hub...so the use of the 4-square boxes is a violation.


#106843 - 01/21/05 08:19 AM Re: Flexible Cord Issues  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,261
Fullerton, CA USA
'99 - 370.23(h) '02 - 314.23(H)

(1) Flexible Cord. A box shall be supported from a multiconductor cord or cable in an approved manner that protects the conductors against strain, such as a strain-relief connector threaded into a box with a hub.


Page 1 of 2 1 2

Member Spotlight
Lostazhell
Lostazhell
Bakersfield, CA (Originally Orange Co.)
Posts: 1,431
Joined: February 2004
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.017s Queries: 15 (0.004s) Memory: 0.8228 MB (Peak: 0.9985 MB) Zlib enabled. Server Time: 2017-09-24 21:09:42 UTC