ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 331 guests, and 25 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 4 of 4 1 2 3 4
#96331 01/06/06 09:52 AM
Joined: Mar 2005
Posts: 399
A
Member
We are starting to inspect for the Ufer ground. 250.52
The Code requires 1/2 inch rebar. If the contractor uses 3/8 inch rebar do we ignore it, and go back to just using a ground rod and water plus Building steel when available.
Some contractors around here just float pieces of rebar into the concrete and don't tie wire them together or have them raised up on chairs.
Alan--


Alan--
If it was easy, anyone could do it.
Work Gear for Electricians and the Trades

Workgear for Electricians

#96332 01/06/06 12:57 PM
Joined: Apr 2005
Posts: 73
D
Member
Alan,

Were you actually around in the 20's? I can remember things from when I started out, and have heard about others. Have you ever tried to update an older home originally wired with all rigid conduit?

#96333 01/06/06 03:24 PM
Joined: Jul 2004
Posts: 10,049
Likes: 39
G
Member
I suppose there are places where rebar in the footer is not required but it is one of the major inspections in the Florida Building Code. It has to be #5 or larger, tied and up on chairs.


Greg Fretwell
Page 4 of 4 1 2 3 4

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5