In Sw Fla the GEC is connected in the meter socket as often as it gets to the service disconnect. The grounded conductor is bonded to the meter can, beyond our control and if you also bond in the service disconnect the standard rule around here is there can be no parallel metal paths between the meter base and the service disconnect.