ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 420 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Jan 2002
Posts: 1,457
E
Member
To each their own. I can think of good reasons for doing it either way.

Joined: Jul 2002
Posts: 241
S
SJT Offline
Member
What I do for switch box locations, is to nail up a larger cu. inch box, I think 21 cubic inch. This way, I can go from there to another device or 2 with out worrying about over crowding the switch box. I've hardly nver ended up with a dead ended 2 wire.

Joined: Sep 2004
Posts: 86
N
Member
Good customer:Three conductor to all outlets in the room. Three conductor to switch box. Three conductor to light box from switch box. Customer can choose which outlets are switched, a neutral is in the switch box, and the ceiling box is wired for a future fan and light.
Bad customer: Two conductor to all outlets in the room. Two conductor from receptacle box to switch box. Two conductor from receptacle box to light fixture. Tag the white wire being used to feed the switch and terminate the switch leg to the light fixture in the receptacle box. (just kidding)
Above work based on time and material jobs for customers that want the best.
Ron