ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Advertisement:-Left

AE-Gifts, Affordable Everyday

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 557 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
gfretwell #220913 07/16/20 03:07 PM
Joined: Apr 2002
Posts: 7,413
Likes: 10
Member
I was at a three phase, 277/480 pole mount pots job today, and those pots all had OCP/switches.

Couldn't get any pics due to the location. My utility inspector said 'the secondary is off, switches are down' with his binoculars.


John
Tools for Electricians:

Tools for Electricians, Installers & Maintenance Technicians

gfretwell #220914 07/16/20 04:17 PM
Joined: Jul 2004
Posts: 10,053
Likes: 40
G
Member
I saw in the Cooper catalog, that is an optional feature. I don't see any here but I have only been looking a day or so. My wife thinks I am nuts looking at transformers and taking pictures of them.


Greg Fretwell
gfretwell #221763 06/09/22 10:02 PM
Joined: Jun 2022
Posts: 2
A
New Member
If a transformer were to choose a primary fuse rating that was higher than its rated current, it would have the ability to see fault current indefinitely. Fuses on the primary side of the transformer are typically chosen based on their characteristics (i.e. time delay vs amount of overcurrent before they blow). For liquid immersed transformers of various rating classes, there are various graphs and tables that define the levels of short time thermal overloads, such as the IEEE 57 series (of which 57.109 focuses specifically on fault current duration). Additionally, they have recently attempted to consider not only thermal damage, but also mechanical damage. All kinds of real-world factors complicate the process, including coordination of secondary side protection with primary side protection, and variables beyond the minimum requirements found in standards.

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5