We make mention to the various PMs, landlords, owners, etc., that the 'sins' have to be corrected, and to my knowledge all the ECs get 'extra' for the removal or 'clean-up'.
Fair is fair. 99% of the time there is no argument. It may take a 'red' sticker the 1st time!!
We make mention to the various PMs, landlords, owners, etc., that the 'sins' have to be corrected, and to my knowledge all the ECs get 'extra' for the removal or 'clean-up'.
Fair is fair. 99% of the time there is no argument. It may take a 'red' sticker the 1st time!!
Well isn't this how to low ball a reno bid HotOne?
When I do inspections on old buildings with new tenant fit ups, I always ask the EC to "Try" to remove as much old wire as possible. Most times the EC's are very willing to work with me ( sometimes it is an extra for the job) plus it gets rid of a lot of old crap in there way. For the most part it looks a whole lot better when I go back for my "Above Ceiling" inspection. Granted they can't get rid of all of the old wires, cause some cut through other secure areas in the building.