ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Positive Ground on 125 VDC Station Batteries
by The Watt Doctor. 05/23/19 08:55 AM
2020 is at the printers.
by gfretwell. 05/22/19 10:11 AM
Chinese wire symbols?
by Texas_Ranger. 05/19/19 03:09 PM
Pool - Daisy chained GFCI
by gfretwell. 05/18/19 01:30 PM
110.26 working clearances
by HotLine1. 05/14/19 02:08 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 5 guests, and 22 spiders.
Key: Admin, Global Mod, Mod
Previous Gallery
Next Gallery
Print Thread
Rate Thread
A 250.94; Why???? #196470
10/06/10 04:15 PM
10/06/10 04:15 PM
NEED 250 94 (2).jpg
Joined: Apr 2002
Posts: 7,090
Brick, NJ USA

HotLine1 Offline OP

Member
A 250.94; Why????

Found this recently. Comments Please
1 Comments
Re: A 250.94; Why???? [Re: HotLine1] #196498
10/09/10 03:39 AM
10/09/10 03:39 AM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,362
Estero,Fl,usa
Because 250.94(1) says
Quote
A set of terminals securely mounted to the meter enclosure and electrically connected to the meter enclosure. The terminals shall be listed as grounding and bonding equipment.


not a service raceway?


Greg Fretwell
Super Rod Cable Installation Tools

Super Rod Cable Rod System
Super Rod Cable Rod System -
Voted
Best Product of the Last 50 Years by members of NICEIC


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Trumpy
Trumpy
SI,New Zealand
Posts: 8,260
Joined: July 2002
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
255,246 Are you busy
191,292 Re: Forum
181,072 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.016s Queries: 18 (0.005s) Memory: 0.9457 MB (Peak: 1.0794 MB) Zlib enabled. Server Time: 2019-05-26 13:21:38 UTC