ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 266 guests, and 9 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Feb 2006
Posts: 78
L
Member
Yoopersup yes I do have a code book

Work Gear for Electricians and the Trades

Workgear for Electricians

Joined: Mar 2003
Posts: 849
Y
Member
Draw it out again this time More Detail Showing Phase wires, Neutral wires, Grounding Electroid Conductors, Equipment grounding conductors & wire sizes.
Also just curious since you don't have breakers to feed the two 480v 100 amp switches I take it your taking them off the (Load side) of the 200 amp using the tap rule & proper Lugs?? Service MUST be grounded per 250.52
Transformer Grounding per 250.30
Both sized per 250.66
The way your drawing is you"d have 6 phase wire & Service Equipment Ground from 200amp to wireway as Grounding would end at the ist 200amp switch from there on be Equipment ground.
A better More detailed Drawing Required as I think you can see.

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5