ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 750 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Mar 2004
Posts: 251
W
Member
These are hard to replace the service (expensive) The City requires all homes to have only 1 main disconnect. You must install a 3 pole disconnect to handle the full load and then separate panels for single and 3P.

Work Gear for Electricians and the Trades

Workgear for Electricians

Joined: Oct 2006
Posts: 745
E
Member
I've also seen quite a few 120/240 Delta installations in Northern NJ, in fact I learned the hard way on my first experience with one in Park Ridge at a lighting store.

These services are also popular in North Carolina in 50's era homes. As a kid, I was always curious as to why they had two 4/0, a 2/0 neutral and a #2 for the third leg. Now I know why. The GP circuits, range, etc. are fed from the single phase 200A panel and the electric heat/HWH loads run from a separate panel using only the high leg. I am sure that dates back to the days when lower rates were offered for heat/HWH.

That is one beast that you need to tame before you touch it for sure.

With today's proliferation of DIY shows on TV and home centers, I seriously doubt that we'll ever see a new 3-phase service in a residence again. Even in high-rise condos, I'm sure that single-phase is all that we'll ever see. There's too much risk with Harry Homeowner.


---Ed---

"But the guy at Home Depot said it would work."
Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5