Thanks, guys.
spark,
Our PoCo allows any number of 240 loads to be operated Off-Peak. With the new FR controlled timers they don't interrupt at all n weekends or holidays and in the winter they only interrupt for about 2 hrs., as opposed to about6-7 in the summer. Many people are willing to include their clothes dryer on this system. Also 240v. pool pumps.
The quad I've seen has a common trip on the inside 2 poles and a handle tie that spans the inside 2 and connects the outer 2.
I have reconsidered though, and may install a small 6 ckt panel instead. If I do this I will have to install a main.
Does anyone know who makes a device to secure a back-fed branch CB as required if used as a main?(Found a Seimens MBR1 to do this)

Thanks again.

[This message has been edited by Redsy (edited 05-21-2002).]