we just run the PVC to the pole with a 90 glued on before its set down in the trench so its centered on the hole for the sona tube with enough stub sticking up to be above the finished concrete also if you cant put on the 90 yet and have to bury the pipe temporarily throw in a tracing wire to be able to find it with a underground tracer like they do with sewer pipe


Be Fair, Be Safe
Just don't be Fairly Safe