We can't put anything in the meter base except service conductors either. It would be the perfect place for the GEC: outside. Our meter bases even include a lug on the neutral for it.
So we have to make an extra wall penetration, or run the GEC through the same hole as the service entrance conductors, and down the wall from behind the meter (nobody's complained yet).