Do I just count the first water heater or the first 1500W of a system with 2 water heaters on line?
Load analysis on plans shows 1500 W and DF of 1.0 which gives a load of 1500W but the load shown on the panel schedule is 2 water heaters using 1750 each leg of 208 single phase service..
i think the plans are wrong..
thanks for any replies.
-regards
Mustang