The cables need to be stacked or bundled for more than 24" before derating is required.
I don't recall seeing a conductor fill requirement for a bored hole.
I guess it would depend on the length of the bored hole, as to it being considered a "raceway"?

steve

[This message has been edited by stamcon (edited 06-06-2004).]


Steve