If the panels are right next to each other, why not run to the # 4 from the water meter. and loop it to both panels Into #1 out of #1 into #2 and bond each panel. You could do the same with the supplemental ground, or just run the supplemental ground to the water pipe
[This message has been edited by russ m (edited 09-14-2003).]
[This message has been edited by russ m (edited 09-14-2003).]