Hi John Steinke,

We don't want to splice the cable while entering into the false flooring of MCC room. The MCC room has a false false flooring and the MCC /DBs are installed on the false flooring tiles. From the cellar deck (lower deck), which is classified as Class I, Div 1 area, the MC cable has to enter the false flooring first and after a small run on the cable trays in the false flooring, it will be terminated in the MCC.
Our problem is how to enter the false flooring from a Div 1 area i.e. through conduit or through Muti cable transits? The MC cables are installed on cable trays in the cellar deck. So if the entry is through conduit, then what area all the fittings to be considered?