Disregard the Home Depot guys..after all, if they were electricians, they wouldn't be working at Home Depot! I suppose that if the commercial above-ceiling space was used as a plenum then the wall board would go all the way up to the top plate..if not, then the stud spaces would be the same air space as the plenum, and plenum rated cable would be required.