I'm delurking to ask some of you guys your opinion on something.I'm the resident electrician for a plumbing contractor and part of my job involves bathroom remodels. As you can imagine most of them are not up to code, specifically 20 amp lines to the recepts. Most that I get involved with are on 15 amp circuits and tied into the lighting circuit and I'm wondering at what point do I become responsible to get new lines up to the recepts.It seems all bathrooms are on 2nd floors and on slabs making it near impossible sometimes to get to the panel(hear the violins playing? [Linked Image]
I had one inspector say it was a preexisting condition but then again this is Pa. :> )
BTW anybody ever see a porcelain pullchain in a shower with just the little metal chain showing ,I have. :> ) just looking for opinions thanx,