The lighting guys insist on atleast 150A at 240V... They want 50KVA... I'm going to rent a genny for the lights and run the sound (and auxillary string lights) off of the temp UG 200A panel (25KVA Xformer).

The light guys have a load center that connects to the genny... and they prefer 3 phase. Drop a G-rod, hook up the load, and done deal. Quiet-Run Diesel 50KW is about $400... 1/3 the cost of the 4/0 SOW it would have taken for the job...

The sound will get their dedicated buss...

And I'm a hero...maybe...

Next disaster please...

[Linked Image]

Steve, I'm seriously considering your ideas on the sub panel and Pipe...

I'll run SOW out to the sound house with the snake to run things there.

Only about 50' of cable will be exposed to the public... Mats will be needed there.

About 400' of string lights...

A bunch of recepts...

Use 3-Way 20A switches as by-passes in case dirty equipment trips the GFCI's? I'd hate to scramble rewiring a bunch of outlets...

But it would be expensive too...

CYA CYA CYA

[Linked Image]

Am I a Gaffer yet?

[This message has been edited by sparky66wv (edited 07-28-2001).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI