I'm bored of doing the same old grounding, so here's what i propose. I'd like to solicit some opinons here, NEC or otherwise;
Make the Gounding Electrode conductor on with the neutral at the point of connection to a service, (weatherhead(s))
Run the GEC down to 2 rods, continue on into the structure, bonding all as i go with the same GEC, and end at the H2O pipe.
what say you?