One contractor I worked for, had an old 3ph industrial fuze panel with edison fuzes and the knife switches, I don't know where they pulled it out of, but they had removed it from the panel, and polished up all the copper and had it in the reception area of the shop, was neat to look at, don't know that I would have wanted to work w/ a system like that though