Hrm.. ya I install alot of these. I dig em down to the height I want it. Come in with the UF. pour in the dry cement... backfill, level the fixture. Then I'll use a hose or pour some water over the hole. Done deal.
This is Michigan and going 18 or so " deep I haven't seen any come up due to frost.