I think that a major reason that the AV guys specify such large conduits is so that they can pull in pre-made cable assemblies with bulky connectors factory-installed on the ends.

I had one of those guys utterly amazed one time when he saw me actually SOLDERING a connector onto the end of a control cable I had pulled in. He actually stated that only the manufacturer has the ability to install those properly... [Linked Image]