From Article 100, Definitions, in the 2005 NEC

Location, Wet. Installations under ground or in concrete slabs or masonry in direct contact with the earth..................

The definition is essentially the same in the 1940 NEC, too [Linked Image]

[This message has been edited by electure (edited 08-09-2006).]