Hmmmm, just took a look at thier NECA-1-2000, Standard Practice for Good Workmanship in Electrical Contracting....


Not very impressive, not much in that document is going to do what this article about it describes, http://www.ecmweb.com/mag/electric_cleaning_installation_practices/index.html

It's a basic standard, what I'm talking about is the Apples and Oranges of finish. (Both are friut but different) And how to define that....

I often have to tell people under me on some jobs that "It more about placement and finish, than "Electrical" work." Especially when measuring and leveling something for the third time.... When I say it needs to be 8-3/16" off the floor - I mean 8-3/16" not 8-1/2" Level means "level", with a LEVEL not eye-balled.


Mark Heller