Will not work a service change if there is even a threat of serious rain within 6 hours of starting the job, unless the customer is willing to risk going a night without power. Doing the tie-in in the rain is simply too risky for my tastes.
Outside work like installing receptacles, fixtures, etc. I will do unless it is a serious downpour or involves working with hot wires (troubleshooting, etc.).
Inside work, no problem barring a hurricane or blizzard or something that might leave me stranded at the job site.
[This message has been edited by NJwirenut (edited 06-30-2006).]