Is this for residential?

If so , I never seen anybody use tape?

We rarely twist anything together. Occasionally we do.

I roll the wires in thier respective position in the box, for what order I want the switchs in.

The last thing I tuck in is the grounds and I tuck those in horizontally. Protecting the other conductors from the dreaded dry wall guy.

We strip the line side of GFCI.

The only time markers are ever made are for stacked switches that aren't obvious. Or other boxes that may be confusing.


[This message has been edited by Trick440 (edited 06-24-2006).]


Shake n Bake