VA:
Our utilities limit the length of UG runs; IF they are pulling primaries, or if the secondaries belong to them.

They also have stringent specs for the hand holes/pull boxes which must be followed. Also, large radius sweeps are utility specs.

Basically, PSE&G says ...'two 90's, and keep the rest straight.
PS: That's not an NEC thing.

John


John