Check with the inspector before you use the schedule 40.
Many inspectors require schedule 80 if it is exposed coming out of the ground regardless of bumper poles.
The underground run can be 40 and then switch to 80 for the stub up.
Small cost difference, big headache to make changes.
Alan--


Alan--
If it was easy, anyone could do it.