Thanks everyone for the input. I'm in Atlanta, Georgia; and we have a Siemens plant here local. I know that the Murray panels have ITE type QP breakers listed inside the panel cover, but never thought that the Siemens panels wpuld fit. I am going to try that and see. As for the replacement of the panels, the GC does not to occur the cost of a panel change-out. Believe me, I would love to replace all of the old panels, just for the sake of working room inside the panels. I have already changed about 8 panels out. All were Zinsco panels!! FIRE HAZARD. I refuse to leave a panle in that has a history of catching on fire! But I had to put my foot down just to get the OK for that! Hope everyone is busy! I have more work than I can do. Main reason I don't have the time to get on here as much as I like! Again, thanks!
Paul Guldenschuh