![[Linked Image]](https://www.electrical-contractor.net/ubb/confused.gif)
I don't see the parallel. I certainly have had issues where I have had to use creative code interpretation. It is a fact of life especially in remodel type work. The example you are talking about in my opinion has no wiggle room. Again where do you draw the line? Just because one way is an easier way does not make it right. for those who are wondering what the heck I am talking about....
https://www.electrical-contractor.net/ubb/Forum1/HTML/005509.html [This message has been edited by Electricmanscott (edited 02-19-2005).]