Not trying to bash a manufacturer, but I had a bad batch of red P&S three ways that were installed in 7 O.R.'s. Out of the 14 installed 8 were replaced within 2 months.

This involved dressing out in sterile garb and scheduling with the facility, it was quite a pain.


Roger