yeah it sounded like a load of crap to me..also...the structure is single story, wood framing. the same guy was saying that we weren't allowed to bore holes in the rafters and to lay the wires (12/2, 12/3)over the top of them. this also sounded like crap to me, but it was my first day, so I said:"ok, if that's how you want to run it fine with me." he said that the foreman(who i haven't met yet) didn't allow it...I was thinking that he didn't allow it because it took too long.

The whole thing is kind of sketchy, don't really know what to think yet.

also...the guy was saying that the boss didn't like 2 wires stapled stacked on top of each other, and to run them side-by-side on the 2x4...this also seems like a bunch of crap to me....

[This message has been edited by Clydesdale (edited 01-29-2005).]