Steve, If you read the ROPs and ROCs for switch grounding you will see that the panel clearly intended that the screw itself provide the bonding. They do not intend to require metal to metal contact as with a receptacle. The screw threads in contact with the box and the screw head in contact with the switch yoke is all that the code requires. Don