At a local Drive-In Restaurant..(remember those?)
Rebuilt 6 outdoor menu signs and ran new feeder to all signs and outline lighting... (started out as a "bulb change"...there were no ballasts in two of the signs and all of them had atrocious wiring...)
Rewired a Fryer (with 190ÂșC wire) and "repaired" the on/off switch (rotary type with points, which one side had failed to make contact...)
Replaced Switches for Exhaust Fan and Hood Lights, tightened up all three hood lights, a "completely dismantle to repair ordeal..."
Tightened up ceiling fan and replaced socket and globe, again it had to be dismantled first...
Replaced 250V A/C Receptacle.
Replaced 125V A/C Receptacle.
Replaced blacklight bulb and switch in bug zapper...
Tightened cord connector in marquis sign (not as easy as it sounded, had to dismantle almost the entire thing in this one too!)...
Didn't have to order a single part and fixed everything on the customer's list.

If I actually accomplish everything I have scheduled for the next two weeks I'll post the results and declare a miracle. Rough-in a 2600 sq ft house and wire a service and feeders for a music festival... Yes the nightmare came true and they both occurred in the same two week period... I was afraid of that.


[Linked Image]


[This message has been edited by sparky66wv (edited 07-21-2001).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI