I often get the same type request. I price the job just the same(or more) as if we did everything, then I can afford to check out all their work. If the work is sloppy, I will refuse to touch it unless we completely rewire it.

I once had a customer try to save money, by saying he would drill all the holes for our wires(3000 sq ft). I told him I'd take off $50. We drilled the holes.

[This message has been edited by Electric Eagle (edited 05-19-2003).]