One customer we have has 2 meters. One is subject to this load shed program. The program has been in place for years, and they've enjoyed reduced rates in exchange for the possibility of having to shut down this service if the need arises.
They've installed a complete duplicate set of compressors, cooling towers, pumps, etc. on the regular service. When requested to dump the load, they simply turn on the backup equip., and shut down the requested system. Solenoid valves then are used to transfer the piping.
It keeps them in production, and technically is totally legal (no modifications are allowed to the load shed service, but they're only switching plumbing connections!) And, oh yes, their load goes up immensely while both systems are running during the transfer, and since the backup equipment is actually larger than the primary system, the load stays above the original figure for the duration of this energy-saving "blackout") Both services are tapped from the same utility transformer.
. This whole power shortage thing's become a big joke, but the jokes on us all.
Tom, talk to me about nuts that stay in SoCA in February, when I'm surfing (maybe it'll even be raining!)and you're freezing. (You're right, though, we are all nuts for putting up with the things we do)



[This message has been edited by electure (edited 07-06-2001).]