Yes, the two 200A Discos is the way I'll go with this, thanks.

Got the materials quote today, and looks like the materials will come closer to $1700 (deflation?) and I'll keep the labor in the 80 man-hour range as well.

Figure I'll ask for $3500, then let 'em drop me to $3300 so they'll feel good about themselves.

Yes, the panels will have MCBs.

Thanks for all the help!

[Linked Image]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI