its amazing how fast one can produce a total of 360 deg. i recently did a rough in involving a concrete slab. had a 90 (pvc) up into the panel and a 90(pvc) up into the wall at a recpt box location. had to offset each riser(emt) in order to attach to their respective boxes. offsets only 2" to 3" not a difficut pull however more than 360 deg.
i imagine each of the offsets = 90 deg.