Compared to the Germans we are close, they have a minimum of about 25KVA for a service and it is 24KVA here. That might even be for a little cable box on a pole if it is metered. We needed a 100a service for a picnic shelter with a single 2 tube T12F40 light. When we get around to changing that to LED it gets even sillier. I admit they do go nuts at Christmas and string a few hundred watts of Christmas lights around it. We are ready tho. There are seven 20a circuits available if we want to bring in a Carnival. wink


Greg Fretwell