Greg:
RE: The field eval mentioned in my above post...

It was three packaging machines, for a large on-line operation. These exact machines were previously installed (and field tested) at their other area locations. Three (3) locations in an adjacent town.

The field evaluation was a multi day operation, and labels were affixed. Units were 480 volt, 3 phase, plug-in, and 120/20 amp plug-in.


I was not present during the cert, but got copies to put in the job files. Foreman said it was "painless".



John