lighthouse, actually, if this weather ever breaks, i'll prolly need all the help i can get.
![[Linked Image]](https://www.electrical-contractor.net/ubb/frown.gif)
..i have 2 fair sized commercial jobs that should have already been started, but because of the weather, the GC is behind, the concrete guys are behind, etc. i know whats gonna happen, when we finally can start these jobs, its gonna be "balls to the wall", 7 days a week, to get 'em done on time. never fails...
![[Linked Image]](https://www.electrical-contractor.net/ubb/frown.gif)
right now, we are doing a lot of shop work, cleaning and making repairs to service trucks and equipment, (like replacing cords on the threaders, bandsaws, and drills), and doing some in-shop training for the younger guys. several years ago, i build a large pegboard training panel, with a wide variety of wiring devices mounted on it,devices that are used in industrial apps. as well as residential and commercial devices. i even have an allen-bradley PLC-5 setup for training the motor control guys. this "rube Goldberg" apparatus intrigues most of the young guys, and even some of the older ones,
![[Linked Image]](https://www.electrical-contractor.net/ubb/wink.gif)
....and, right now, we are spending a lot of time with it, doing wiring arrangements, troubleshooting scenarios, etc.
if only the weather would warm up a little........
![[Linked Image]](https://www.electrical-contractor.net/ubb/wink.gif)