I got out there again and got some pictures of the equipment on both ends of the directional bore. They are out of the ground in the bay now and they will start jetting the raceway into the bottom soon. I want to see that process too.

http://gfretwell.com/electrical/DIRECTIONAL%20BORE/

This is the FTP directory for some of the pictures.
They are assembling the raceway in the bay about a half mile at a time, with two going at a time.
They have a half mile of water pipe from a fire plug, going down to the boring machine. Lots of big equipment there. The boring rig, a mud mixer/reclaimer making the slurry and cleaning the junk out and a big pump shooting it into the bore.


Greg Fretwell