"Why would you want to start wiring before the building is enclosed?"
It is a 3 story wood framed building, we want to start the rough-in as soon as the first floor is up, the wiring is all Lumex.
How can you say that Romex is a water wick, do you mean to say it wicks through the pvc coating, I doubt that. If it wicks water through the cut of ends that is easy to control.