I recently completed a rough in for a mbr/mba remodel. I actually installed a switch in the bedroom to kill all the power in the room. except for the switch and the sd. The HO was concerned about sleeping with the emfs. He also would not allow any osb because of the chemicals. Everything was no VOC if possible. Not sure if the cut off switch is code but it's in.