Hi Chuck11,
thanks for the feedback.
I will be doing a load Calc for sure. I'm juggling everything at once. My road block right now is waiting for my permit to get approved, then I'll have a specific inspector assigned to my project. I'd prefer to talk to the same person about this instead of talking to different people.
I just took a closer look at my service... and I have to admit, i dont know much about anything behind the panel.
My main service/cut-off is labelled as a 100amp service (2 pole, 3 wire). It has two 100Amp one-time fuses.
So I guess that means I'm limited by 100Amp... but isn't that 100Amp per pole?
Bottom line, I'll do some more reading, and speaking with an electrician as well my inspector about these details.
Thanks