John, I like your attitude.

I get quite irate when I specifically call for something in the plans and specs only to have the Contractor tell me that "It's not required by the Code so I didn't include it. If you really want it you have to pay me extra".
Then we end up with the fight over what is included in the signed contract and it gets ugly really fast.

Not every job is 'design-build'...sometimes I want something just because I want (or need) it.


Ghost307