Anybody read 210.70 in its entirety?

NO, the 'location' of the switch is not spelled out within the NEC, that is design, common sense, good trade practice, etc.; however a switch controlled lighting outlet is required.

The OP did not say resi or comm, but he mentioned a Building Code that deals with egress illumination. IF he is going comm (egress) then 1006 of the Bldg Code specs illumination.



John